Back to Blog

After a late spring thaw, expect a jump in Swedish inflows and run-of-river production

Eylert Ellefsen
Archived blog post. This blog post has been transferred from our previous blogging platform. Links and images may not work as intended.

Some key observations:                              

  • SE1 inflows will hit a new maximum from June 15th as the snow level in the northernmost area is still well above normal.
  • Inflows in SE2 are culminating this week as the snow level declines.  
Inflow statistics SE1 (normal: 2000-2020)
Inflow statistics SE2 (normal: 2000-2020)

The delayed spring thaw and inflow means that the normal increase in run-river production (ROR) during the melting period has been delayed, too.

New run-of-river models:

EQ has recently developed run-river production models for all main rivers in Sweden (with SE1 and SE2 having the highest relevance).

The following charts from our online service show the development for ROR-production thisyear compared to average, 95%- and 5%-tile for the period 2000-2020:

Weekly run-of-river production SE1
Weekly run-of-river production SE2

We observe the very delayed increase for SE1, and the increasing trend for SE2.

EQ expects run-river production will increase the next few weeks before culminating in the latter part of June.

The short-term (buffer) reservoirs in SE1 and SE2 are excepted to reach their summer-levels in a week or two.

Conclusions:

  • From the end of June, the run-river production will be more exposed to the precipitation situation as the melting period comes to an end.
  • Pricewise, this means the downward pressure on spot prices from the Swedish hydropower system will continue until the end of June.

More from the Blog

French nuclear outages winter 2022/23 and power balance outlook

Eylert Ellefsen
Eylert Ellefsen

French nuclear production is expected to reach its lowest production level since 1991 this year. This is mainly because of extended technical inspections and a large number of outages, but reduced production during the heat waves this summer has also played a part. By the end of August, we see that 25 out of 56 French nuclear plants are out of operation, resulting in a production output of 26 GWh/h – which is about 10 GWh/h lower than for the same month last year. EDF has announced production targets of 280-300 TWh for 2022, and 300-330 TWh for 2023. Based on these targets, EQ has studied the power balance outlook for 2022/23 and the nuclear production estimates for the winter.

Read Story

Hydropower production in the Alp region at 25 year-low after the summer drought

Eylert Ellefsen
Eylert Ellefsen

The European Continent has experienced an extraordinarily hot and dry summer. As a result, there has been a lot of focus on reduced nuclear capacity due to higher river temperatures and low flow rates. In this blog post, EQ will focus on the hydropower situation across the Alp region – having hit the lowest production levels in 25 years this summer. For reference, the Alp region includes Germany, France, Switzerland, Austria, and Italy with an accumulated yearly production level of 187 TWh.

Read Story

Norway-South: Hydro Reservoir scenarios towards December – will the supply situation be threatened next spring?

Eylert Ellefsen
Eylert Ellefsen

There is a strong public focus on the very low hydro reservoir situation in Norway-South as spot prices are surging, and we continue to experience an energy crisis across Europe. How can Norway-South avoid any risk of a supply squeeze?

Read Story

Ready to try Energy Quantified?

No payment or credit card required.
Would you rather like a personal demo? Book a demo