Back to Blog

Austrian hydropower: Extreme precipitation and flooding in week 32 (updated)

Eylert Ellefsen
Archived blog post. This blog post has been transferred from our previous blogging platform. Links and images may not work as intended.

During Sunday, 2 August and Tuesday 4 August there was an extreme precipitation incident across Austria, and partly Switzerland and Italy too.

Both the hydro reservoir areas in Tirol/Voralpberg and the river areas flowing to Donau were hit hard. The flowrate in Donau, around Vienna, increased from about 1200 m3/s from Sunday up to 6500 m3/s by midday on Wednesday 5 August. The flooding situation is currently retreating, but slower than the rising curve for the first days.

Energy Quantified has studied the hydropower situation during this extreme incident and amongst several factors focused on spilt water and spilt energy.

Precipitation

We have collected some information about precipitation on several key locations in the Austrian hydropower system from Sunday to Tuesday:

Sum precipitation on Sunday, Monday and Tuesday, 2-4 August at key locations for the Austrian hydropower system.

Calculated into energy terms, our model show about 2,2 TWh precipitation for these three days (700% of normal, 1.9 TWh above the normal).

The number of 2.2 TWh must be interpreted as a gross number, as the flooding will lead to a lot of water flow beyond the capacity of the hydropower plant, the so-called spillage of water. Thus we have studied the river plant production curves and our energy inflow data to get an impression of the spillage, and then modified our model data for this specific incident.

Inflow and run-river production

The chart below shows the hourly run-of-river production across Austria from Thursday 28 July until Wednesday 5 August. The output rose by about 2000 MW after the weekend and came close to the maximum capacity of 5700 MW. Probably a lot of plants had to reduce their production due to the high flow rates as we usually see in such flooding incidents.

As earlier mentioned the Donau flowrate at Vienna rose from 1200 until 6500 m3/s (hourly max), and a daily average increase of about 5300/1200 = 440%.

In the chart below, we show the modelled inflow curve (gross), which has increased by a factor 300/125 = 240 %, well below the Donau increase of 440%. Statistically, max inflow (net) has been about 215 GWh/day. Thus we modified our inflow calculation as seen in the chart.

Meaning that for week 32, we estimate about 240 GWh (15%) spilt inflow energy in Austria, and we will not see the run-of-river production increase to above 5000 MW.

Our latest reported reservoir filling number for end week 32 is currently 90.3%, up 18.8% from week 31. This number does not take into account an estimated water spillage of 240 GWh. The modified reservoir level is about 5% lower – at an 85.0 % filling rate. That is still a substantial increase of 13% from week 31.

Final words

The hydropower situation in Austria is now at a very high resource level. Production from the reservoirs will most likely have to be increased in the coming weeks to avoid further flooding and uncontrolled production levels. We assume that the run-of-river situation will normalize in a week or two. So far, we haven't seen any effect on the spot market as the German renewables are the main price drivers. However, the strong Austrian hydropower will contribute to slightly lower domestic spot prices.

More from the Blog

French nuclear outages winter 2022/23 and power balance outlook

Eylert Ellefsen
Eylert Ellefsen

French nuclear production is expected to reach its lowest production level since 1991 this year. This is mainly because of extended technical inspections and a large number of outages, but reduced production during the heat waves this summer has also played a part. By the end of August, we see that 25 out of 56 French nuclear plants are out of operation, resulting in a production output of 26 GWh/h – which is about 10 GWh/h lower than for the same month last year. EDF has announced production targets of 280-300 TWh for 2022, and 300-330 TWh for 2023. Based on these targets, EQ has studied the power balance outlook for 2022/23 and the nuclear production estimates for the winter.

Read Story

Hydropower production in the Alp region at 25 year-low after the summer drought

Eylert Ellefsen
Eylert Ellefsen

The European Continent has experienced an extraordinarily hot and dry summer. As a result, there has been a lot of focus on reduced nuclear capacity due to higher river temperatures and low flow rates. In this blog post, EQ will focus on the hydropower situation across the Alp region – having hit the lowest production levels in 25 years this summer. For reference, the Alp region includes Germany, France, Switzerland, Austria, and Italy with an accumulated yearly production level of 187 TWh.

Read Story

Norway-South: Hydro Reservoir scenarios towards December – will the supply situation be threatened next spring?

Eylert Ellefsen
Eylert Ellefsen

There is a strong public focus on the very low hydro reservoir situation in Norway-South as spot prices are surging, and we continue to experience an energy crisis across Europe. How can Norway-South avoid any risk of a supply squeeze?

Read Story

Ready to try Energy Quantified?

No payment or credit card required.
Would you rather like a personal demo? Book a demo