Back to Blog

France’s hydro reservoir filling hits new high and expected to rise further

Eylert Ellefsen
Archived blog post. This blog post has been transferred from our previous blogging platform. Links and images may not work as intended.

EQ on Wednesday forecast France hydroreservoir filling will reach close to 80% of max capacity by the end of next week (wk 24) and will continue rising given normal levels of precipitation and inflow.

Hydro reservoir levels in France have been high and rising since last autumn, and are now about 25% higher than the normal of 55%. Key takeaways from our latest forecasts are:

  • Assuming normal levels of precipitation and inflow for this time of the year, the reservoir filling rate will come out in the range of 90% - 95% in July, compared to a max level of 80% for the same month over the past 5 years.
  • If France gets more precipitation than normal, reservoirs would probably be full in some regions, with a risk of spillage and flooding.

The forecast 2020 curve represents an estimate of the reservoir filling given normal inflows and higher production than normal:

Hydro reservoir filling France, actual + forecast

The hydropower production forecast for week 24 and onwards shows about 130% of normal production during July (+1,500 GWh/+1,700 MW compared to normal)

This means that hydropower production during July will be close to the levels at the start of June, and partially compensate for the low nuclear capacity before the holiday period in August.

For the 2nd half of 2020, we estimate production will be about 17% stronger than normal, which translates into about 4 TWh. This is not, however, enough to compensate for the low nuclear capacity when the holiday season ends at the start of September.

Net hydroproduction France 2015-2020 (GWh/wk)

In conclusion, the French power balance will improve until the end of July, but the hydropower resources will not be able to compensate for the planned reduction in nuclear output in Q4.

EQ's hydropower forecasts cover all of Europe and include all aspects of the hydrological system, including evaporation, river temperatures, snow and groundwater levels, etc.

More from the Blog

French Q4 prices still overpriced – Fearing power shortages in November-December

Eylert Ellefsen
Eylert Ellefsen

In April, EDF sharply cut its nuclear output target for 2020 from the 2019 level of 380 TWh to 300 TWh, and then revised it up again in July to 315-325 TWh. In this blog post, we offer an updated overview of the nuclear outlook, power balance and market prices for the rest of the year.

Read Story

COVID-19 impact on European demand – update and outlook

Eylert Ellefsen
Eylert Ellefsen

On 25 April (week 17), EQ published a blog post showing the impact the Corona-virus was having on the consumption for 16 countries across western Europe. As the holiday season has mostly come to an end, we have now reviewed our demand outlook for the rest of the year.

Read Story

Austrian hydropower: Extreme precipitation and flooding in week 32 (updated)

Eylert Ellefsen
Eylert Ellefsen

The hydropower situation in Austria is now at a nearly maximum resource level. Production from the reservoirs has to be increased in the coming weeks to avoid further flooding and uncontrolled production levels. So far, we haven't seen any effect on the spot market as the German renewables are the main price drivers. However, the strong Austrian hydropower will contribute to slightly lower domestic spot prices.

Read Story

Ready to try Energy Quantified?

No payment or credit card required.
Would you rather like a personal demo? Book a demo