Back to Blog

Normalized hydropower situation in the Southeast Europe by Christmas and New Year's Eve

Eylert Ellefsen
Archived blog post. This blog post has been transferred from our previous blogging platform. Links and images may not work as intended.

Despite a dry spell in October, the hydropower situation in Southeast Europe improved significantly during a wet November. Throughout December, the situation has normalized in most areas.

Sign up to try Energy Quantified for free. No payment or credit card required.

In short, we can summarize the hydropower situation for Southeast Europe, including Slovenia, Croatia, Bosnia, Serbia, Romania, Montenegro, North-Macedonia, Bulgaria and Greece, as follows:

  1. Hydrological balance across the region is slightly positive before the New Year's Eve.
  2. Precipitation outlooks for the Christmas and New Year’s weeks show about 115% of normal
  3. Production outlooks for the Christmas and New Year’s weeks are close to 100% of normal.

Background and current situation

The hydrological balance across the region is slightly higher than the long-term normal, so the hydropower supply situation is adequate before Q1-2020. Looking at Romania and Serbia, we see that both inflow and production increased during November, then somewhat decreased during the first part of December. The latest weather forecast indicates increased inflow levels during the Christmas period.

About a quarter of the total supply in the region is hydropower, so variations hydro production has a strong impact on the power market.

Estimated hydrological balance at the end of week 51. Note that the numbers are shown as the deviation from the normal. Numbers in TWh.
Hydrological balance for Romania.
Snow and groundwater for Romania.
Water reservoir filling for Romania.

Outlooks for the Christmas week and towards New Year’s Eve

The general outlook towards the Christmas period and New Year’s Eve is that we will see lots of precipitation start of the Christmas week (51), but production outlooks are close to normal.

For the entire region, our estimates show 125% and 110% of normal precipitation for weeks 51 and 52 respectively. The hydropower production for week 51 is estimated to come close to the normal in the region as a whole. This means about 1 TWh for the entire week or an hourly average production of 6350 MWh/h.

Closing words

The Montel-EQ team provides you with updated hydrological analysis throughout the Christmas period, preparing you for the start of the new year.

If you have any questions regarding the hydropower situation here or anywhere else in Europe, please send me an email at eylert@energyquantified.com.

More from the Blog

Alpine hydrological balance recovers strongly to boost Q1 2024 outlook

Precipitation across the Alpine region (France, Switzerland, Austria and Italy) has been fairly abundant since mid-October. Inflows and hydropower production have increased significantly as a result. Outlooks for the winter 2024 are also now improved when compared to winters 21/22 and 22/23. This blog will highlight the current conditions and the hydropower outlooks for Q1 2024.

Read Story

French nuclear outages: winter 2024 and powerbalance outlooks

Eylert Ellefsen
Eylert Ellefsen

The outlooks for French power supplies last winter (Q1-23) were quite bullish because of high gas prices and uncertainty around the nuclear situation due to massive outages for corrosion-checks. A potential cold winter also contributed to a strong risk premium in forward markets.

Read Story

Energy Quantified 2.0 launched

Energy Quantified (EQ) is proud to announce the launch of EQ 2.0, a comprehensive upgrade to our existing platform. Including a suite of new products, enhanced functionalities and a fresh facelift, EQ 2.0 reaffirms its commitment to delivering unparalleled data transparency and intelligence to energy professionals across Europe.

Read Story

Ready to try Energy Quantified?

No payment or credit card required.
Would you rather like a personal demo? Book a demo