Completed implementation of the new EC short-range models
A new short-range EC ensemble model is added and quantified. The upgrade is the last in a two-stage upgrade of the ECMWF model system. The first step was to include a 90-hour short range EC deterministic model. The added model is initiated 06 and 18. The new model has a 144-hour lead time runs on hourly resolution. At the same time the current ensemble model is updated with hourly time-step for the first 90 hours too.