New EC short term model
A new short range EC deterministic model is added and quantified. The added model is initiated 06 and 18. The new model has a 90-hour lead time runs on hourly resolution. At the same time the current deterministic model is updated with hourly time-step for the first 90 hours too. The upgrade is the first step in a two-stage upgrade of the ECMWF model system. The next step is to include a 144-hour short range EC ensemble model. We expect the upgrade to be complete in week 50.